How many jobs does a data center create, and how many people work there?
Peak construction crews, permanent staff and modeled 'supported' jobs, with sources, plus live ads by town: 1,095 of 3,217 were build roles on 22 Oct 2026.
The jobs a data center creates come in two very different sizes. A typical large data center puts about 1,500 construction workers on site at the peak of its build, then has about 50 people working there full time once it is running, roughly half of them contractors. Those are the figures industry representatives gave Virginia's legislative audit commission for its 2024 study. The bigger numbers quoted in local debates, hundreds or thousands of jobs per site, count a third thing: jobs "supported" across a whole state, estimated with an economic model.
Local arguments about a proposed site often mix those three up. This page takes them one at a time and says who published each. Then it adds a count nobody else publishes: the live job ads on this board, town by town, split into building the site and everything else. One caution first: a live ad is not a hire. One ad can fill several seats, some stay open for months, and construction ads end when the build does.
How many people work at a data center
About 50, full time, once it is running. That is the figure industry representatives gave Virginia's JLARC for a typical 250,000-square-foot data center: facility managers, engineers, technicians and maintenance staff, with about half of the 50 being contractors who work there full time, such as electricians, pipefitters and security officers. Local agreements set floors on the same scale: at least 30 full-time jobs for the QTS campus Cedar Rapids, Iowa, announced in February 2025, and at least 31 for Google's there. While a site is being built the number is far higher, about 1,500 workers at the peak. The sections below take each figure in turn, with its source.
Three numbers that get mixed up
Construction workers at the peak
Virginia's Joint Legislative Audit and Review Commission (JLARC) found in its December 2024 data center study that a single building usually takes 12 to 18 months to construct, and a full campus can take five years or more. Data center representatives told JLARC that about 1,500 workers are on site at the height of construction: surveyors, equipment operators, steel and concrete crews, electricians, pipefitters and HVAC installers. That is a peak, not a year-round headcount, and the crews move on when the building is done.
Permanent staff on site
The same study, again citing industry representatives, put a typical 250,000-square-foot data center at about 50 full-time workers. About half are direct employees: facility managers, engineers, technicians and maintenance staff. The other half are contractors who work there full time, including electricians, pipefitters and security officers. Across all of Virginia, whose northern region JLARC calls the largest data center market in the world, it estimated those on-site jobs, employees and contractors together, at over 8,000 full-time jobs in fiscal 2023.
Local deals set floors on the same scale. When Cedar Rapids, Iowa, announced a QTS campus in February 2025, the city and Alliant Energy, the local utility, said construction would bring "hundreds of construction and trade jobs" and at least 30 high-tech full-time jobs once operational, 15 in each of the first two phases. The city's 2024 agreement for a Google data center requires at least 31 new full-time jobs that meet the state's wage threshold. Bigger campuses promise more: AWS said its $11 billion investment in St. Joseph County, Indiana, near New Carlisle, would create "at least 1,000 new jobs" on a campus the county commission's president said would be built over the next decade.
Announcements often blend the numbers. QTS's own release in August 2025, for a Cedar Rapids campus it put at seven buildings and $10 billion, said the project is "expected to support over 2,000 high-quality construction and permanent jobs." That folds the first two numbers into one.
| Project | Who said it | Jobs |
|---|---|---|
| QTS, Cedar Rapids, Iowa | The city and Alliant Energy, Feb 2025 | Hundreds of construction and trade jobs; at least 30 full-time once running |
| QTS, Cedar Rapids, Iowa | QTS, Aug 2025 | Over 2,000 construction and permanent jobs, in one number |
| Google, Cedar Rapids, Iowa | City agreement, Mar 2024 | At least 31 full-time jobs |
| AWS, St. Joseph County, Indiana | AWS, Apr 2024 | At least 1,000 new jobs |
| A typical Virginia site | Industry, to JLARC, 2024 | About 50 full-time once running; about 1,500 at the build's peak |
Jobs "supported" across a state
The biggest figures come from economic models. To the jobs on site they add jobs at suppliers (indirect) and at the shops and restaurants where workers spend their pay (induced). They are estimates, not counts, and who produced each one matters.
A U.S. Chamber of Commerce report published on 15 October 2026 says a typical 50-megawatt data center supports 740 jobs a year statewide over a 20-year operating life, and about 5,220 a year during a two-year build. The Chamber ran the model itself, in a report that calls the economic case for data centers clear. Its methodology starts from 50 workers at the data center, plus five each at the local electric and water utilities. The rest of the 740 is the model's estimate of what that payroll, a $1 billion equipment refresh every fifth year and the spending around them support.
PwC's 2026 study, commissioned by the Data Center Coalition, the industry's membership association, put direct employment in the U.S. data center industry at 1,005,080 in 2024 and estimated that each of those jobs supports about 4.5 more elsewhere. It defines the industry by function, counting data center services wherever they are produced, so its "direct" jobs reach well beyond the staff inside the buildings.
An independent model tells the same story about timing. The analysis JLARC commissioned from the Weldon Cooper Center estimated 74,000 jobs a year in Virginia, but 59,000 of them came from construction. Operations accounted for 15,000, of which 4,400 were data center employees, with full-time contractors left out. JLARC concluded that holding the benefit at that level depends on continued building.
What the job ads show
None of those sources counts job ads. This board does. On 22 October 2026 it carried 3,217 live ads from 108 employers. About a third, 1,095, were for building sites: construction (974) and commissioning (121), the testing that proves a new facility works before it goes live. The other 2,122 were everything else: 636 technician ads, 404 critical facilities, 263 operations, 180 logistics, 126 security, 70 network operations, 61 HVAC and 57 electrician, plus 285 in design engineering and 40 in sales and entry-level roles.
The split follows the board's role categories, so it is approximate, and if anything it undercounts the build side: design engineers plan future sites, and many electrician ads are for electrical superintendents on construction jobs, yet both land in everything else. That day, 76 towns had at least 10 live ads, 27 had 25 or more and 12 had 50 or more. Another 162 ads named no town.
Why an ad is not a hire
Every count on this page is of ads, and an ad is not a job filled. Keep these limits in mind before quoting one.
- One ad can fill several seats. A single requisition can cover a cohort of trainees or a run of identical technician posts.
- Some ads are evergreen. They stay open for months to collect applicants, whether or not a seat is free that week.
- Construction ads end when the build does. A town's build count says where the work is now, not what stays.
- The trades crews barely appear. On 22 October 2026 only 21 live ads had "electrician" anywhere in the title, while one building can have about 1,500 workers on site at its peak. Much of that workforce is hired by subcontractors and through union halls, not public ads.
- The board does not see every employer. It covers the employers it monitors, 108 of which had live ads that day, and its counts move daily.
- A town is where the ad puts the job. Project, program and design roles can be listed at an office that serves sites elsewhere.
Town by town
These are live ads on 22 October 2026. "Build" means construction and commissioning roles.
- Childress, Texas: 50 ads, 29 of them build. IREN, which has a campus there, posted 44. LotusWorks posted four and two other firms one each.
- Cedar Rapids, Iowa: 50 ads, 27 of them build, from 10 employers: the clearest view of owners and contractors side by side. QTS posted 12 and Google 3, the two companies with the city agreements above. The contractors STO Building Group and E2 Optics posted 11 each and NetworkConnex 3, and GXO Logistics posted 4.
- Southaven, Mississippi: 54 ads, only 8 of them build. xAI posted 53 of them. One employer can be nearly a whole town's count.
- Ashburn, Virginia: 66 ads, only 9 of them build, from 12 employers led by NTT Global Data Centers (17), QTS (11), Oracle (11) and Equinix (8). Ashburn is in that Northern Virginia market, and most of its hiring is outside construction. Nearby Herndon had 53 ads, all from Amazon Data Services, 35 of them outside build.
- Nashville, Tennessee: 78 ads, 57 of them build, more build ads than any town but Dallas (59). Oracle posted 69. Read the titles on the town page before treating that as work at one Nashville site.
Look up your town
Start at the state index, pick your state, then your town. Every town with at least three live ads has its own page, listing the ads and who posted them, so you can see the owner, its contractors and its facilities firms for yourself, and read the titles and dates before quoting a number.
Those pages change daily. For a figure that holds still, the monthly hiring index freezes the board at a recorded time each month and never changes afterward: live jobs, leading states, roles, employers and advertised pay. And when a company or a council quotes a job number for a site near you, ask which of the three numbers it is, then check it against what is advertised.