Richland Parish data center jobs: who is hiring near Meta's site

What has been announced for Meta's Hyperion campus in Holly Ridge, and who is hiring nearby: 14 live ads in Rayville and Monroe on 22 October 2026.

On this board, Richland Parish data center jobs are contractor jobs. On 22 October 2026 it carried 14 live ads in Rayville and Monroe, near Meta's Hyperion campus in Holly Ridge, all from contractors and facilities firms. None of Meta's own postings on the board was in Louisiana.

Meta and the state have projected far more: 7,500 construction jobs at peak and approximately 1,000 operational jobs. Below is what has been announced, with sources, and who is advertising near the site.

What is being built in Richland Parish

Meta announced the project on 4 December 2024: a $10 billion AI data center of 4 million square feet on the 2,250-acre former Franklin Farm megasite, between Rayville and Delhi and about 30 miles east of Monroe, according to Louisiana Economic Development. Meta then expected construction to continue through 2030.

On 13 July 2026 Meta raised its commitment to more than $50 billion, expanding the campus to nearly 10 million square feet and 5 gigawatts of IT capacity, according to the state's announcement. Officials said the full build-out of both phases is not expected to be complete until 2036, WWNO reported.

In October 2025 Meta put the campus into a joint venture with funds managed by Blue Owl Capital, which hold 80 percent of it to Meta's 20 percent. Meta manages construction and the property, and the partners committed to about $27 billion in development costs, a figure set before the July expansion.

The project then and now
December 2024July 2026
Investment$10 billionMore than $50 billion
Size4 million square feetNearly 10 million square feet
Construction workers at peak5,0007,500
Operational jobs500 or moreAbout 1,000
Build-outConstruction through 2030Both phases complete by 2036, as reported
Louisiana Economic Development announcements of 4 December 2024 and 13 July 2026; the 2036 date as WWNO reported it.

The Entergy gas plants

On 20 August 2025 the Louisiana Public Service Commission voted 4-1 to let Entergy Louisiana build three gas-fired combined-cycle plants for the project: two in Richland Parish, expected online in late 2028, and one at Entergy's Waterford site in St. Charles Parish, expected by the end of 2029.

The expansion needs more. Entergy has asked the commission to approve seven more gas units, four near the data center and three near the Big Cajun generating site in Pointe Coupee Parish, plus three battery storage projects. In April 2026 the commission voted 4-1 to fast-track the request, and its final decision is expected in December 2026.

Hyperion so far
4 Dec 2024
Meta announces a $10 billion campus on the Franklin Farm site
20 Aug 2025
Regulators approve three Entergy gas plants, 4-1
Oct 2025
Blue Owl funds take 80% of the campus in a joint venture
Apr 2026
Seven more gas units fast-tracked, 4-1
13 Jul 2026
Expansion to more than $50 billion and 5 gigawatts
Dec 2026
Final vote on the seven units expected
From Louisiana Economic Development, Meta, Entergy and Public Service Commission coverage, as cited in this guide.

The jobs Meta has announced

Both job figures have grown with the project:

  • December 2024. Meta estimated 5,000 construction workers at peak and projected 500 or more direct new jobs in Richland Parish.
  • December 2025. Meta said it had supported 3,700 construction workers so far, expected a peak of 5,000 by June 2026, and that the finished data center would support more than 500 operational jobs.
  • July 2026. After the expansion, the state put it at 7,500 construction jobs at peak construction and approximately 1,000 operational jobs.

Meta's own page for the campus says the operational jobs will be electricians, HVAC specialists, server and network techs and engineers. None of these announcements says when that hiring starts.

These are projections, not hires, and the gap between them is normal: far more people build a data center than run one.

Who is hiring there now

The 14 live ads on 22 October 2026 split eight in Rayville and six in Monroe, and nine of them were construction roles:

The 14 ads near the site, by employer
Construction and commissioningEverything else
Black Box
5
Salute Mission Critical
3
NetworkConnex
3
IES Holdings
2
M.C. Dean
1
Live ads in Rayville and Monroe, 22 October 2026. None came from Meta itself.
  • Black Box, five in Rayville: two senior construction managers, a project manager, an estimator and a construction cost analyst.
  • Salute Mission Critical, three in Rayville: a critical facility engineer, an electrical lead and a mechanical lead.
  • NetworkConnex, three in Monroe: a foreman, a lead technician and a field superintendent.
  • IES Holdings, two in Monroe: both field engineer roles, one of them in structured cabling.
  • M.C. Dean, one in Monroe: a commissioning engineer associate. Commissioning is the staged testing that proves a building's systems before it goes live.

Louisiana had 27 live ads in all that day. Meta had 13 live postings on the board, six of them in Menlo Park, California, and none of Meta's own postings on the board was in Louisiana. That describes this board on one day, not Meta's plans.

For trade work on the build, go to the source. Meta's campus page says each building takes thousands of skilled trade jobs to construct, from steel workers and pipefitters to electricians, carpenters and fiber technicians, and sends job seekers to the project's three general contractors: Mortenson, DPR Construction and Turner Construction. Meta's newsroom points local workers to the project's own site. None of the three contractors had a Louisiana ad on this board on 22 October 2026.

An ad is not a hire, and construction ads end when the build does. Of the 14, Salute Mission Critical's critical facility roles are the closest in kind to the electricians, HVAC specialists and engineers Meta says the finished campus will support.

What the ads pay

Only three of the 14 ads stated pay, all of it hourly:

  • NetworkConnex foreman: $36.50 to $41.75 an hour.
  • IES Holdings field engineer: $27 to $33 an hour.
  • IES Holdings senior field engineer, structured cabling: $35 to $45 an hour, on a role advertised as 100 percent travel, so its Monroe location is no promise of local work.

The median midpoint of those three ranges is $39 an hour; across the whole board that day, the median midpoint of 664 hourly ranges was $40. Three ads are too few to call a local rate. The other 11 state no pay at all, including every Black Box and Salute Mission Critical ad, so ask early.

Training in northeast Louisiana

Free routes first.

  • America's Workforce Academy. Meta's skilled-trades program named Louisiana one of its four 2026 pilot states. Its page describes four-week tracks in construction and fiber work that need no prior experience, with Meta covering tuition, airfare, lodging and a daily stipend.
  • Scholarships for Richland Parish graduates. Meta pledged $5 million to Louisiana Delta Community College for scholarships, and says graduates of Richland Parish high schools, from the class of 2026 on, are eligible for full scholarships for any data center related trade certificate or course.

The paid route is the college's own Data Center Technician course. Its page describes an intensive four-week program for entry-level data center jobs, covering construction and electrical basics, workplace safety, equipment operation and data infrastructure. It lists five certifications: BLS, OSHA 10, CORE, NSC Lift Truck and Corning Fiber Optic Splicing. It costs $3,698, runs Monday to Friday from 8 a.m. to 4 p.m., and students must be at least 18. Cohorts run in Winnsboro and at the Monroe campus; on 22 October 2026 the next Monroe cohort was listed for 2 November to 4 December.

Training near the site
OptionCost to youLength
America's Workforce AcademyFree; Meta covers tuition, airfare, lodging and a daily stipendFour weeks
Meta scholarships at Louisiana DeltaFull scholarships for Richland Parish graduates, class of 2026 onAny data center trade certificate or course
Louisiana Delta Data Center Technician course$3,698Four weeks, weekdays 8 a.m. to 4 p.m.
From Meta's and Louisiana Delta Community College's pages, read 22 October 2026.

For programs beyond Louisiana, see the guide to data center apprenticeships and training programs.

How to watch for openings

Counts move daily. Three ways to keep up:

  • The town hubs. Rayville and Monroe list every live ad the board carries in each town.
  • The state hub. Louisiana data center jobs catches ads filed under other towns, including any that name Holly Ridge or Delhi.
  • A job alert. Set an alert for Louisiana and your role, and the board emails you new listings that match.

To follow Meta's own postings, watch its company page on this board.